Monthly report for February 2015

Cikk
18.3.2015
1 minute read
:

In February Photon Energy’s power plants outperformedforecasts by 38% and our O&M division signed contracts for 13,5MWp in the Czech Republic.

Download the report here (pdf).

All our reports can be found on the Reportspage in our Investor Relations section.

Používáním těchto stránek souhlasíte s užitím souborů cookies.

Rozumím

Join our Newsletter

The copy needed. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aenean euismod.

Amdgkas dkagd kaghd…

This site is protected by reCAPTCHA and the Google
Privacy Policy andTerms of Service apply.