September 2019 at Photon Energy

Tzsdertest
10.10.2019
1 minute read
:

In September, electricity generation amounted to outstanding 4.4GWh, exceeding energy forecasts by 19.0%. Our portfolio of powerplants under construction in Hungary increased to 18.1 MWp, out ofwhich 12.6 MWp is expected to be grid-connected before year-end2019.

Construction of the 4.6 MWp rooftop solution for ALDI StoresAustralia reached the final stage before commissioning expected inNovember 2019. 

Download the monthly report here (pdf).

All our reports can be found onthe Reports page in our InvestorRelations section.

MEDIA CONTACT

Martin Kysly
T +420 774 810 670
martin.kysly@photonenergy.com

  

<< Back to News.

Používáním těchto stránek souhlasíte s užitím souborů cookies.

Rozumím

Join our Newsletter

The copy needed. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aenean euismod.

Amdgkas dkagd kaghd…

This site is protected by reCAPTCHA and the Google
Privacy Policy andTerms of Service apply.